During its work "ADI" company has been a general designer and a general contractor on a large number of objects and fulfilled a complex of work as a subcontractor. The company provides engineering and consulting services in the field of building, following the created system of work with clients, main principles of which are: professionalism, quality, reliability, competence and responsibility for performed work.

The following work had been executed by the company:
    Building of new and reconstruction of existing buildings on ChNPP site. Adaptation of projects, developed by foreign companies, to Ukrainian norms and partial development of Detailed Designs (working documentation) for the following objects:
    − Production-Heating Boiler Room (PHBR);
    − Interim Storage Facility (ISF-2;
    − Liquid Radioactive Waste Treatment Plant (LRTP);
    − Industrial Complex on Solid Radioactive waste Management (ICSRM);
    − Fire Protection System of object "Shelter" (OS FPS);
    − Modification of Nuclear Facility - Spent Nuclear Fuel Management (ISF-1, Units 1, 2 SSE ChNPP);
    − Completion of an On-Site Dry Storage Facility for Spent Nuclear Fuel at Chernobyl NPP Site (ISF-2).

Development of Design and budget documentation on execution of full roofing repair of Unit 3 (block "A" and block "B") and adjoining part of the Chernobyl NPP main building.

Development of Design documentation, production, metalworks installation, building and assembly works at Liquid Radioactive Waste Treatment Plant (LRTP).

Execution of building and installation works on Interim Storage Facility (ISF-2) site:
− check-point;
− sewerage pump station.

Development of Method statement and Working documentation on physical protection of Chernobyl NPP.
Development of Work Execution Plan and Detailed Design Documentation on a system of liquid radio-active waste retrieval.

Development of Fire Protection System project for the "Shelter" object at Chernobyl NPP.

Development of architectural and engineering drawings complement anda 3D model of an existing Spent nuclear fuel processing facility (SFPF) and building of Interim Storage Facility (ISF-2).

Development of Design documentation and execution of a part of building and installation works on the object "Industrial Complex for Solid Radio-active Waste Management" (ICSRM).